LCS is the contractor under the Contract for the implementation of activities for the construction of the gas distribution network for the city of Vratsa Second Stage.
Reference issued by 'GBS' JSC in favor of 'LCS' OOD, in assurance that during the period of joint work, the company has performed the assigned activities in terms of quality and time, on the construction of water pipelines and sewage networks...
Thermal insulation EPS 4 cm., PVC mesh, putty and mineral plaster were made on the site - 350 m2, performed by 'LCS' OOD. The contract period is from 12.10.2015. until 11.12.2015 The activities under the contract closed on 11.12.2015.